This is where my break has sat on stands since mid-November. I was hoping to have it finished by January! I've got to move it from this garage by next week as it's blocking access to a sit on lawn mower that will be required by the groundsman who works there.
I should have taken some more pics but unfortunately this is the only one, taken by my wife. She's been really patient considering we don't have a car at the moment, just our huge lumbering Merc bus.
Work done since November:
- Complete re-pipe - hydraulics, everything inc fuel lines, returns.. this was a monster job during the coldest days of winter
- doseur strip and re-build
- Rear arm bearings
- Front wishbone bearings
- lower balljoints
- drop-links
- front brake calipers strip and re-build. New disks & pads.
To do :
- complete tie-rod assemblies. The whole of the front suspension was shot. I've had to replace everything.
- multiple welding areas: both sills, rear box section removal and replacement, front inner wings. I've taught myself to weld recently, using the Merc bus for practice!
- bleed system and re-new LHM.
Hopefully get it running, off its stands by next week then commence the weld-a-thon. Then off to the TÜV, hopefully in the not too distant future..
